top of page
3rd Self-Propelled Field Artillery Group (3rd GAC AP) Pavilion - Santa Maria
Renovation of the entire Pavilion with the replacement of the entire Roof, Installation of PVC Lining, Electrical Installation of BT, Hydraulic Installations, Installation of the Wooden Floor with the application of Sinteko, Supply and Installation of Aluminum Frames.
- Length: 860m²
1
2
4
1
1/4
bottom of page